20. Dropping the Keel Timber / Bolting the Scarph (Patreon)
Content
This episode, I drive the 3000 miles back to Tally Ho from South Georgia, where Steve Cross has been milling Live Oak for me. I bed and bolt the 6’ Scarph in the new keel timber together, and the Live Oak arrives by flatbed. Then we create a framework inside to boat to spread the load of the props while I remove the Keel Timber from underneath it, all the while hoping that nothing breaks and that the boat doesn’t deform at all in shape.
---
To see more sneaky pictures of progress on Tally Ho between videos, follow my instagram and facebook pages;
https://www.instagram.com/sampsonboatco/
https://www.facebook.com/sampsonboatco/
To see other ways to support the project, visit this page of my website;
http://sampsonboat.co.uk/how-to-support-tally-ho/
Files
Previews only